Baseline status

Sheet
01
Date
13 Oct 2026
Files
14
Step
−7

Current step: −7, Project requirements and CDE setup. The Project Files tree is in Autodesk Forma Data Management on Construction: Sample Project – Snowdon Towers. Folder structure and file placement are done. Metadata, permissions, user groups, and a controlled document workflow are still open inside this step.

1. What this baseline records

This report freezes the position before the next project step. The local folder was listed on 13 October 2026 and the same five folders were uploaded under Forma Project Files.

The five folders group files by type. They are a practice filing structure. They are not an ISO 19650 state model of Work in Progress, Shared, Published, and Archived.

2. Position on the workflow

The two charts below are the sequence this baseline is read against. This practice project is on the first chart, at step −7. Power BI is step 04 on the second chart.

Workflow chart from step −7, Project requirements and CDE setup, through step −1, Tender RFIs registered and answered.
Steps −7 to −1. CDE setup, design, sharing, tender issue, procurement, and tender RFIs.
Workflow chart from step 0, Public RFI register published as Excel, through step 07, Semantic search and RFI AI copilot, with steps 05 to 07 marked planned.
Steps 0 to 07. The public RFI workbook, raw data, Python, SQL, and Power BI, then the planned analytics steps.
StepNamePosition at this baseline
−7Project requirements and CDE setupIn progress. Files are in Forma. Register, permissions, and workflow controls are still to do.
−6Site planning and initial designSample drawings and a model are present as content. This practice project has not run a site-planning activity.
−5Design work in progressSame sample content. No authoring session has been recorded.
−4 to −1Share, authorise, procure, answer tender RFIsNo review, approval, or procurement action is recorded.
0 to 04Public RFI Excel through Power BILater, and on the analytics path in Report 08. Power BI has not started.

3. Where the records sit

The Forma shell is Report 02. The fourteen files are read in Report 03. S102, the one sheet opened on screen, is Report 04. The structural model is Report 05.

The issue workbook, the steps that produce it, and the 289-row profile are Report 06. Finishing CDE setup is Report 07. Power BI is Report 08, and it stays later.

4. Held for the next step