Snowdon Towers baseline reports

Written 13 October 2026. Read these in order: where the practice sits, the Forma shell, the fourteen files, the sheet that was opened, the model, then the issue workbook. Finishing CDE setup, and Power BI, come after that.

Sheet
00
Date
13 Oct 2026
Files
14
Step
−7
  1. 01

    Baseline status

    Where the practice sits: step −7, and which report holds each record.

  2. 02

    Project structure in Forma

    The modules in the left navigation, and the five type folders under Project Files. One folder was opened.

  3. 03

    Project Files register

    All five folders and all fourteen files in the download, read from the copies on disk.

  4. 04

    Inspection of S102 in Forma

    The one sheet opened on screen: one page, version V1, and a review form that could not be sent.

  5. 05

    Structural model

    The Revit file in 03_Models: format, saved-with links, and the Forma 3D screen at V1.

  6. 06

    Issue workbook

    How Snowden Towers Sample Issue Summary.xlsx is produced, and the 289-row profile.

  7. 07

    Next step: finish CDE setup

    The document register still to complete inside step −7. Analytics stays later.

  8. 08

    Path to Power BI

    The later sequence from a preserved copy through Python, SQL, and reporting. Step reports sit under this page.

Report 06 is the issue workbook this practice reports from. Report 07 is the CDE work still open. Report 08, Power BI, stays later.