Snowdon Towers baseline reports
Written 13 October 2026. Read these in order: where the practice sits, the Forma shell, the fourteen files, the sheet that was opened, the model, then the issue workbook. Finishing CDE setup, and Power BI, come after that.
- Sheet
- 00
- Date
- 13 Oct 2026
- Files
- 14
- Step
- −7
-
01
Baseline status
Where the practice sits: step −7, and which report holds each record.
-
02
Project structure in Forma
The modules in the left navigation, and the five type folders under Project Files. One folder was opened.
-
03
Project Files register
All five folders and all fourteen files in the download, read from the copies on disk.
-
04
Inspection of S102 in Forma
The one sheet opened on screen: one page, version V1, and a review form that could not be sent.
-
05
Structural model
The Revit file in 03_Models: format, saved-with links, and the Forma 3D screen at V1.
-
06
Issue workbook
How Snowden Towers Sample Issue Summary.xlsx is produced, and the 289-row profile.
-
07
Next step: finish CDE setup
The document register still to complete inside step −7. Analytics stays later.
-
08
Path to Power BI
The later sequence from a preserved copy through Python, SQL, and reporting. Step reports sit under this page.
Report 06 is the issue workbook this practice reports from. Report 07 is the CDE work still open. Report 08, Power BI, stays later.