Next step: finish CDE setup
- Sheet
- 07
- Date
- 13 Oct 2026
- Status
- S102 done
- Step
- −7
The next step stays inside workflow step −7. It records what Forma actually shows for the 14 uploaded files. S102 preview, version, and the review path are now in Report 04. The other files still need rows. This step does not move the set to Shared, Published, or tender, and it does not start Python, SQL, or Power BI.
1. Already done
- Snowdon Towers is open in Forma Data Management.
Project Filescontains01_Design Files,02_Drawings,03_Models,04_Reports, and05_Contracts.- The local tree behind that upload is read in Report 03.
2. Work sequence
- Confirm each file in Forma. Open the five folders. Check that the 14 names in Report 03 are present. Preview PDFs where the viewer allows it. Note anything the trial account hides or refuses.
- Write the document register from the screen, one row per file. Use the columns below. Copy only values Forma or the file shows. Leave revision, suitability, and review status blank when they are absent.
-
Inspect one file for versions and review.
Use
S102-Main Level.pdf. Open file details and version history. If the account allows a comment, label it as a practice comment. A practice comment is a learning record. It is not an engineering approval and it does not change the workflow step to −4. - Record which controls exist. For permissions, attributes, versions, reviews, issues, and export, write one of: available and used, available and not used, or absent in this trial.
- Stop at the register. When the register and the capability notes are saved, step −7 can be closed. Export, cleaning, and reporting are Report 08.
3. Register columns
| Column | Rule for the first pass |
|---|---|
| Practice ID | Assigned locally, for example ST-S-102 for the S102 PDF. This ID is ours. It is not a Forma URN unless Forma displays one and we copy it. |
| File name | Exact name in Forma. |
| Folder | One of the five type folders. |
| Type | PDF, DWG, RVT, XLSX, or DOCX. |
| Discipline | Structural for the S-series drawings and the RVT, from the file names. Other files: record the discipline only when the file or Forma states it. |
| Uploader and upload date | From Forma file details. |
| Version | The version number Forma shows. |
| Revision | Blank until a revision designation is visible. |
| Suitability | Blank until a suitability code is visible. |
| Review status | Blank unless a real review record exists. A practice comment stays in the notes column. |
| Notes | Trial limits, preview result, and any practice comment. |
4. Drawing names to register first
| Practice ID | File | Type | Discipline |
|---|---|---|---|
| ST-S-102 | S102-Main Level.pdf | Structural | |
| ST-S-103 | S103-Second Level.pdf | Structural | |
| ST-S-107 | S107-Roof.pdf | Structural | |
| ST-S-108 | S108-Stair Towers.pdf | Structural | |
| ST-S-600 | S600-Details.pdf | Structural |
The multipage PDF, five DWGs, the RVT, the issue workbook, and the subcontract agreement still need their own rows. The DWG names use spaces and hyphens (S102 - Main Level.dwg) and are separate documents from the PDFs.
5. Close this step when
- All 14 Forma rows are in the register, with blanks left blank.
- S102 version and review options are described from the screen.
- A short note lists what the trial account allowed.
- No file has been given an invented approval, revision code, or suitability.